Alignment of the surface with a cement screed for coating

When using a cement screed as a basis for coating, you should stock up on time. Since the drying of each centimeter of the draft floor is on average 1 week. The finished cement screed should dry to a humidity level of not more than 4%. And a hurry in this matter is simply unacceptable. Otherwise, a parquet board or laminate will absorb all the extra moisture and deforms. By the way, if you are interested in the cost of houses from the galled log, then you can find out prices and a lot of other useful information on the site.

The condition of the cement screed can be evaluated independently by drawing the intersection of two lines. At the intersection point, cement should not crumble much. And the smoothness of the surface can be estimated by a long board. Minor deviations of several millimeters are allowed. Recently, self -leveling mixtures have been used for screed. They are especially relevant when laying out piece parquet, where the strips have a large size. Any bumps will greatly spoil the quality of the coating.

If such a long time for laying the flooring does not suit you, then aligning the floor with a cement screed can be replaced by flooring lags.

Lags are boards (may not even be chopped). For this type of black floor, boards up to 10 cm wide, but not less than 8 cm are quite suitable. The width of the boards should lie in interval 2.5-4 cm. Residual moisture in the material should not exceed 20%.