New plaster in the old house and two words about the project of the winter garden

Until the walls of the house are covered with a layer of plaster, the house looks absolutely not. And the overall comfort of residents in the house will depend on the quality of the plaster coating. If plastering work is carried out incorrectly and using incorrectly selected plastering materials, this can lead to increased or reduced humidity in the house. In this case, you will have to dry and ventilate the house for quite some time, and difficult to evaporated moisture will penetrate into a layer of thermal insulation and leave ugly traces on the facade of the building.

Plastering work is recommended to start before the insulation of the house. In the event that the repair provides for the construction of new partitions, plaster work can only begin two months after their construction. It is also better to postpone plastering work until the installation of new windows, since drafts and moisture through window openings are significantly dried and emasculated, which is very harmful to the plaster layer. If you install the windows before the start of plastering is not possible, then it is best to close the window openings with a film, tyirsoplites, or laying with brick without planting per solution. It is also recommended for the winter to lay window openings with polystyrene foam, which will keep the necessary microclimate in the room.