Build a paradise

Any person who decided to build a house begins to study special literature, communicates with people who are dealing with design and construction matters, becomes a frequent guest of construction Internet sites in search of the perfect project. And with disappointment notes that this does not exist.

What to do in such a situation? There are two options – Bind your favorite project you like or place an order for an individual project of a house from professionals.

The second option can be called the most true for the embodiment of all its ideas, plans, needs, that is, for the construction of a house that I dreamed about. The creation of the project will take about 2-3 weeks.

At this stage, the location of engineering networks is immediately determined: water supply, electricity, heating systems, etc. The site itself is investigated, on which construction will be carried out. This makes it possible to properly arrange the house itself, and determine the place for entering the house, and lay the pedestrian paths, solve the issue of landscaping of the site and many other nuances.

The development of a high -quality project and the development of landscape design will take some more time – About three months. If you deal with this issue in advance, in the fall, then you will find the beginning of the construction season fully armed.